Location of the facility – the Bosna River, area of the Zenica-Doboj Canton
Type of facility – run of river power plant
Installed capacity - 12,2 MW
Annual production - 58,5 GWh
Investment
Investment - BAM 90 million
Financing - Loans with funds of EPBIH
Project status
- Feasibility study – 2016
Designer: Consortium - FICHTNER GmbH and Co KG, Electroforce d.o.o. - Geological-geotechnical investigation works – 2016
Contractor: Geosonda Zenica - Preliminary Design – 2021
Designer: Energoinvest d.d. Sarajevo
Auditor: Consortium / Institute for Water Management d.d. Sarajevo, IBE d.d. Ljubljana, IGH d.o.o. Mostar, Zagrebinspekt d.o.o. Mostar - Environmental impact study - 2023
Consultant: Ceteor Sarajevo