Hydro Power Plant
“Vranduk”

Location of the facility – the River Bosna, area of the City of Zenica Type of facility – flow diversion-type electric power plant

Installed capacity - 19.63 MW
Annual production - 102 GWh

Investment

Investments - 142.9 million KM
Financing - Loans and funds of EPBIH

Project status

  • Preliminary design and Environmental Impact Study – 2010
    Designer: Energoinvest d.d. Sarajevo (Leader), IPSA Institute Sarajevo and POYRY Energy GmbH Wien