Conditions for connection to the power network and increase of approved connected power |
---|
Issuance of the preliminary power permit | 30 KM |
Issuance of expert opinions on the route/location of the object being connected to the distribution network according one map with scale 1:2500 | 50 KM / map scale 1:2500 |
Issuance of power permit on 0.4 kV | 50 KM |
Issuance of power permit on MV | 80 KM |
Issuance of approval for change of name of the customer, at the same location and with the same approved power capacity of the connection (only for purchase contract) | 20 KM |
Development of a study of the optimal technical solution for customer connection to MV network | 600 KM |
Development of a study of the optimal technical solution for customer connector producers in the MV network | 1.000 KM |
Issuing certificates without going to field | 10 KM |
Disconnecting or connecting a customer or supplier |
---|
On metering point, connection point - cabinet or TS | 17 KM |
At the site of connection - a pole in the network, or roof pole | 50 KM |
Disconnecting because of unpaid bills and reconnecting after payments during regular working hours |
---|
On metering point, connection point - cabinet or TS | 34 KM |
At the site of connection a pole in the network, or roof pole | 100 KM |
Disconnecting because of unpaid bills and reconnecting after payments after regular working hours |
---|
On metering point, connection point - cabinet or TS | 50 KM |
At the site of connection a pole in the network, or roof pole | 150 KM |
Safety review of connection and metering point at the customer's request |
---|
Safety review of a connection | 17 KM |
Safety review of a connection and metering point | 22 KM |
Different connection services connection and metering point services at the customer's request |
---|
Switching of the limiters or safety switches after their tripping | 14 KM |
Replacing the main fuse | 17 KM |
Special review of the metering point and meter reading for temporary customer disconnection | 20 KM |
Metering at customer’s request |
---|
One day metering and report development about load diagram | 126 KM |
Seven-day metering and report development about load diagram | 142 KM |
Emergency metering of effective voltage at the connection | 64 KM |
Seven-day metering and development of a report on the quality of voltage at the connection point | 112 KM |
Unauthorized electricity consumption |
---|
Establishing unauthorized consumption and disconnecting customers due to unauthorized use of electricity (customer at 0.4 kV) | 80 KM |
Establishing unauthorized consumption and disconnecting customers due to unauthorized use of electricity (customer at medium voltage) | 200 KM |
Establishing of unauthorized switching of a meter | 50 KM |
Management of switching devices in user’s facility requested by the user |
---|
On previously agreed date | 24 KM |
Intervention | 40 KM |
Attendance/watch due to management network upon user’s request |
---|
On previously agreed date | 19 KM/h |
Intervention | 28 KM/h |
Testing proper operation of metering points, and meters using expertise of the Metrology Institute - at customer’s request |
---|
Testing the meter using testing device - direct measurement | 120 KM |
Testing the meter using portable testing device – semi-indirect and indirect measurement | 156 KM |
Testing proper operation of metering points, and meters using portable testing device at customer’s request |
---|
Testing the proper operation of a meter using testing device - direct measurement | 35 KM |
Testing the proper operation of a meter using portable testing device – semi-indirect and indirect measurement | 58 KM |
Testing the proper operation of a meter using portable testing device - several days, semi-indirect and indirect measurements | 116 KM |
Providing metric data on load curves |
---|
Providing metric data on load curves for a metering point to customers with remote reading measuring devices | 10 KM |